SevinTech has been established with the aim of delivering innovative solutions to airlines, MROs, and aerospace companies. Leveraging the extensive industry experience of our team, SevinTech is committed to being a trusted provider of high-quality services and products to customers worldwide. Our core team comprises highly skilled and experienced professionals, including aerospace engineers specializing in electronics, electrical systems, structures, and software. At SevinTech, we are deadline-oriented professionals who believe in excellence, teamwork, and integrity.
Experience
- Design
- Test
- Structure
| Electro Avionic System Installation | |
|---|---|
| Wifi IFE Installation | A300-600 |
| A310 | |
| 49 inches Wall Mounted Monitors Installation | A300-600 |
| EFB (Electronic Flight Bag) | CRJ200, A320, |
| A300-600/A310, | |
| MD-80, B737, | |
| Fokker 100, | |
| BAE 146/AVRO 146-RJ | |
| SSPRAM (Solid State Pre-Recorded Announcement and Music) Installation | MD-80, A320, B737, Fokker 100 |
| Photoluminescence Floor Path Marking replacement with light type | B737 |
| ADS-B Out | DO-260B A300-600/ A310, A320, B737 |
| GNSS (Global Navigation Satellite System) | A300-600/ A310, A320, B737 |
| LED Cabin Lighting | MD-80, B737 |
| QAR Installation | MD-80 |
| Structural Modifications | |
|---|---|
| Stub Beam STA.578 Installation | B737-400 |
| Stub Beam STA.639 installation | B737-400 |
| Outer Wing Outer Flap Track Support Fitting Installation | B737-400 |
| Main Landing Gear Support Fitting Installation | B737-400 |
| Ground Spoiler No.4 Outboard Actuator Attachment Fitting Installation | B737-300 |
| Strobe Light Housing Assy-Mount & Disconnect Bracket Installation | B737-300/400/500 |
| Wing Rear Spar Stiffener RSS 288.00 Installation | B737-400 |
| J18 Junction Box Structural Parts installation | B737-300/400/500 |
| Locking Fork at Flap Track Beam WSTA 5280 | Fokker 100 |
| Cabin Modifications | |
|---|---|
| LOPA Change- Passenger to Cargo Conversation | A300-600 |
| LOPA Change- Business IFE mounted Seat Installation | A300-600 |
| A310 | |
| LOPA Change- B/C to Y/C | A310 |
| A320 | |
| B737 | |
| MD-80 | |
| B757 |
| Test Title |
|---|
| RTCA DO-160 Tests |
| ED-130 Test |
| Fuel Microbial Test /Hydraulic Oil Contamination Test |
| Engine Oil Spectrometric Test |
| Material Strength Test |
| Structure |
|---|
| B737 and Airbus 320 Fatigue and DTA for Various Honeywell Antenna Installations |
| A319/A320/A321 STC Support for Antenna Installation Skin and Frame FAA DTA Approval |
| 737-Classic and NG, numerous Fuselage/Wing/Empennage/Nacelle FAA Approved Repairs |
| 737-Classic Fatigue and Damage Tolerance ICAW Inspection Program |
| 767-300 Cargo Door Repair |
| 767-300 Slat Alteration |
| Development of Composite Allowable Testing Plans |
